RMH Datacenter
The infrastructure arm — floor space, power and the network already in it.
Floor space, power and a network that is already there.
RMH Datacenter is the infrastructure arm of RMH Studios. We build and run the halls the rest of the group sits in — six owned campuses, a private backbone between all of them — and we sell the space, the power and the cooling we did not use.
ASH-01 · 96 m × 38 m × 16 m
- Campuses6Owned and operated, three continents
- Contracted148 MWUtility capacity across the estate
- Fleet PUE1.12Trailing twelve months, weighted by load
- Committed99.999%Power and cooling availability SLA
We were the first tenant, so the hall is built like one
Most colocation is a landlord business: someone builds the shell, and the people running workloads inside it are somebody else. Every RMH hall was specified by the team that had to run a platform in it — which is why the power density, the cross-connect fees and the change-window policy all look like they were written by a tenant.
- Racks sold at the density they can actually draw
- Cross-connects are a one-time fee, never a monthly rent
- Maintenance windows published a quarter ahead
- The same change calendar we schedule our own migrations against
Five ways to take delivery of the same building
- PL-01ColocationLocked cages, full racks and half racks on a raised floor, with A+B feeds, metered PDUs and your own hands on your own hardware.
- PL-02Bare metalDedicated servers provisioned in minutes, with no hypervisor between your workload and the silicon it was sized for.
- PL-03Accelerated computeDirect-to-chip liquid cooled GPU halls built for training runs that would trip a 6 kW rack, sold by the node or by the pod.
- PL-04StorageNVMe block, S3-compatible object and tape archive in the same building as your compute, so a restore is a cross-connect rather than an egress bill.
- PL-05ResilienceA warm second site on another grid and another fibre path, with a failover you are contractually required to rehearse twice a year.
Six sites, and none of them a leased suite
Tell us the load, not the product name
Kilowatts, cabinets, where your users are and what you have to be compliant with. We will come back with the halls that fit and the ones that do not.